Arling / Kötsch drinking water supply
Arling / Kötsch drinking water supply
A high-performance power station for the supply of pure spring water
Bauvorhaben Bezeichnung:
 Arling-Kötsch drinking water power plant 
Execution period:
 2011/2012 
Project description: 
 In the Arling-Kötsch spring area, the purest spring water is fed via a pressure pipeline into the nacelle. With a single-jet Pelton turbine suitable for drinking water, an electrical power of approx. 90 kW is reached and fed into the local power company network
Project cost: 
 Approx. € 300,000.00 






				

