ASFINAG Wolfsberg Süd – St. Andrä
ASFINAG
Renovation of the main lanes of the Wolfsberg motorway
Construction project designation: 
 Repair of the Wolfsberg South - St. Andrä road 
Execution period: 
 2015-03-16 - 2015-11-13 
Project description: 
 Renovation of the A2 main lane, including guidance systems to a length of 9,400 m. Road surface renovation of the Wolfsberg - South connection point, at the parking lots and turnarounds in the project area. Expansion joint replacement at Object 17/1 – St. Andrä junction. Replacement of signposts. 
Project cost: 
 € 10,700,000.00 






				
